Advertisement banner new 1
Advertisement banner new 1

Tadweer Recycles 1,915,724 Tons of Construction & Demolition Waste in 2020

 

Tadweer facilities utilize state-of-the-art technologies to produce high-quality aggregate for strategic project construction.

 
 

Tadweer Recycles 1,915,724 Tons of Construction & Demolition Waste in 2020
 

Abu Dhabi Waste Management Center (Tadweer) announced that it has recycled 1,915,724 tons of Construction and Demolition (C&D) waste in Abu Dhabi in 2020, accounting for 80% of the total C&D waste handled by its facilities, equivalent of 255 domes of Louvre Museum in Abu Dhabi.

Over the past year, Tadweer collected 2,400,000 tons of C&D waste from the Abu Dhabi emirate, which accounts for 32% of the total waste handled by the Center.

To reduce waste resulting from construction and demolition activities across the emirate, the Center is implementing various programs that aim to enhance its recycling capabilities according to the highest local and international standards. This aligns with Abu Dhabi Executive Council’s decision that mandates the use of at least 40% of recycled materials in road and construction projects across the emirate’s three regions. 

Tadweer’s C&D recycling facilities can produce four different sizes of recycled Aggregate measuring 0 mm to 37.5 mm, as well as treated sand. These materials are used in the construction of roads and vital infrastructure projects in Abu Dhabi including Etihad Rail, Khalifa Port, Abu Dhabi Airports, Sheikh Zayed Grand Mosque, Louvre Museum, Saadiyat Island, Ghweifat International Highway, and ADNOC’s oil fields, among others.

Engineer Abdulmohsin Alkatheeri, Acting Director of Projects and Facilities Department at Tadweer, said: “In line with Tadweer’s strategic goal of promoting integrated waste management, the Center has stepped up efforts to achieve the optimal utilization of waste. Such efforts help us ensure the preservation of natural resources and keep Abu Dhabi’s environment clean, safe and sustainable. Through promoting efficient C&D waste recycling and treatment, we aim to promote the use of recycled aggravate in the construction of strategic projects to support the national economy and accelerate sustainable development.”

Between 2016 – 2020, Tadweer produced 11 million tons of recycled aggravate from C&D waste, equivalent of 4,200 km linear street, which is similar to the construction of three streets stretching along the UAE’s coast. In this same period, the Center’s facilities handled an average of 212,000 tons per month of demolition and construction waste, with a maximum of 334,629 tons per month, and a minimum of 147,887 tons per month.

Earlier this year, Tadweer re-opened the Ghayathi Crusher in Al Dhafra region after its refurbishment. With a daily capacity of 2,000 tons of C&D waste, the facility plays a crucial role in achieving the emirate’s environmental goals and developing integrated waste management.

MORE FROM BUILT ENVIRONMENT

Weave Advances Onsite as Al Ghurair Confirms Julfar Contracting as Main Contractor
Weave Advances Onsite as Al Ghurair Confirms Julfar Contracting as Main Contractor

Designed by Australian architect Joe Adsett, Weave comprises 130 residences and, is scheduled for completion by the second quarter of 2028

November 4, 2026 UAE Business
Emaar Moves to take Full Control of Emaar Development: What it Means for Dubai Real Estate
Emaar Moves to take Full Control of Emaar Development: What it Means for Dubai Real Estate

Spending billions on a Dubai development business during regional conflict tells the market that its biggest developer expects long-term demand to hold up

November 4, 2026 UAE Real Estate
SICO Capital Appoints Abdulrhman Alzunaytan as Head of Real Estate
SICO Capital Appoints Abdulrhman Alzunaytan as Head of Real Estate

Alzunaytan will lead SICO Capital’s real estate asset management activities, including the development and management of its funds, in support of the company’s strategic focus on expanding its business

November 3, 2026 Saudi Arabia Real Estate
All About Nad Zabeel: Dubai’s New Research, Design and Innovation Campus
All About Nad Zabeel: Dubai’s New Research, Design and Innovation Campus

Nad Zabeel will be within one kilometre of several prominent landmarks and business centres, including Burj Khalifa, Dubai International Financial Centre, the Museum of the Future

November 3, 2026 UAE Sustainability
From Megaprojects To Human-Centred Cities - Women Are Helping Shape The UAE’s Built Sector: Grant Thornton Report
From Megaprojects To Human-Centred Cities - Women Are Helping Shape The UAE’s Built Sector: Grant Thornton Report

While women make up 56 percent of UAE STEM graduates, they are still underrepresented in leadership roles

November 2, 2026 UAE Business
ALEC FITOUT Inaugurates 7,500m² Facility in RAK: Make it in the Emirates
ALEC FITOUT Inaugurates 7,500m² Facility in RAK: Make it in the Emirates

New 7,500m2 bespoke fabrication facility in Ras Al Khaimah is set to create over 200 specialist jobs and introduce advanced 3D-printing capabilities to the regional fit-out sector

November 2, 2026 UAE Business
 Modulaire Group Expands into the Middle East
Modulaire Group Expands into the Middle East

Company launches Algeco Middle East with new regional headquarters in Dubai

November 2, 2026 UAE Business
The Next Generation of Low-Carbon Buildings in the GCC
The Next Generation of Low-Carbon Buildings in the GCC

In the GCC, low-carbon design should begin with the question: how much of the cooling load can architecture eliminate before mechanical systems even come into play?

October 30, 2026 Saudi Arabia Sustainability
Sharjah Unveils Uruk: A New Generation of Sustainable Cities
Sharjah Unveils Uruk: A New Generation of Sustainable Cities

SPARK, AUS and SEE Holding plan a city that makes its own energy and food and uses AI and robotics to take routine work off residents’ hands.

October 30, 2026 UAE Real Estate
Aldar's Profit Rises 21% As Focus Shifts to Year-End Performance
Aldar's Profit Rises 21% As Focus Shifts to Year-End Performance

The company's rental business delivered solid growth, with adjusted EBITDA increasing 27% and occupancy remaining close to full capacity.

October 29, 2026 UAE Business
 
Subscribe to our newsletter
 
 
// Show popup after 1 second // Close button // Close when clicking outside the popup