Advertisement predictive podcast
Advertisement predictive podcast

TAQA Announces Sale of 250 MW Lignite-Based Power Plant in India

 

TAQA Neyveli owns and operates a 250 MW lignite-fired power plant located in the state of Tamil Nadu, India

 
By News Desk, October 29, 2025 India Energy & Waste Management
 

TAQA Announces Sale of 250 MW Lignite-Based Power Plant in India
 

Abu Dhabi National Energy Company PJSC (“TAQA”), one of the largest listed integrated utility companies in Europe, the Middle East and Africa, announced today the divestment of its 100% stake in TAQA Neyveli Power Company Private Limited (“TAQA Neyveli”) to MEIL Energy Private Limited, an affiliate of Megha Engineering & Infrastructures Limited (MEIL), an India headquartered, large diversified conglomerate with strong business interests in infrastructure, energy and hi-tech manufacturing for a sale consideration of INR 9.26 billion (approximately AED 387 million).

TAQA Neyveli owns and operates a 250 MW lignite-fired power plant located in the state of Tamil Nadu, India. As a result of this transaction, TAQA has fully exited its interest in TAQA Neyveli as the company sharpens its focus on low-carbon, highly flexible gas-fired power generation and, through its stake in Masdar, renewable energy investments. 

Farid Al Awlaqi, Chief Executive Officer of TAQA’s Generation business, said: “This sale represents a considered adjustment to our generation portfolio as we continue progressing towards a more sustainable energy mix. It aligns with TAQA’s broader efforts to transition towards cleaner energy solutions, reduce long-term emissions, and respond to the changing dynamics of global energy demands. Our focus remains on developing flexible, efficient and low-carbon power generation assets that support sustainable growth and the energy transition.”

Over the past year, TAQA's Generation business has made several significant strategic growth investments as part of its long-term strategy to develop leading low-carbon power and water projects.

In the UAE, TAQA recently unveiled plans for an additional 1 GW of gas-fired capacity, along with Masdar's 'round-the-clock' giga-project, which, upon completion, will become the largest integrated solar and battery energy storage system and will be capable of delivering 1 gigawatt (GW) of baseload renewable energy around the clock.  Its subsidiary TAQA Morocco has announced it is exploring the acquisition of an existing Combined Cycle Gas Turbine (CCGT) power plant, as well as the development of new flexible, low-carbon gas-fired power and renewable power generation projects, seawater desalination projects, water transmission infrastructure, and electricity transmission infrastructure in the Kingdom of Morocco.

In the Kingdom of Saudi Arabia, TAQA achieved financial close for the SATORP Cogeneration Plant and for two highly efficient gas-fired plants — the Rumah 2 and Al Nairyah 2 Power Plants, totaling approximately 3.6 GW. In 2020, TAQA had a gross capacity of 21GW, and today the company has grown to approximately 70 GW (as of 30 September 2025), as it sets out to achieve its 2030 target of 150 GW with two-thirds coming from renewables through its stake in Masdar.

TAQA’s clear focus is on investing in efficient, lower-emission technologies that support energy security, enable renewable energy integration, and address growing industrial demand. The divestment of TAQA Neyveli is consistent with this direction, allowing the company to focus on technologies that advance its 2030 Corporate Strategy for sustainable and profitable growth.

TAQA  Masdar  SATORP Cogeneration Plant  Abu Dhabi National Energy Company    

MORE FROM BUILT ENVIRONMENT

Dubai's Toyota Building Demolition: What You Need to Know
Dubai's Toyota Building Demolition: What You Need to Know

The Toyota Building's demolition is part of a broader urban renewal cycle along Dubai's oldest corridors

August 24, 2026 UAE Property Management
R.Evolution Scales EYWA Into A Global Longevity-led Real Estate Brand
R.Evolution Scales EYWA Into A Global Longevity-led Real Estate Brand

As EYWA continues to expand, R.Evolution is developing strategic collaborations with leading players across the wellness and longevity ecosystem

August 18, 2026 UAE Real Estate
Why Delaying Fire Safety Remediation Costs More Than You Think
Why Delaying Fire Safety Remediation Costs More Than You Think

Most capital planning conversations for a building's Quality and Safety Certificate naturally gravitate toward the big, visible line items, such as structural remediation, cladding replacement, or MEP overhauls

August 18, 2026 UAE Business
Abu Dhabi Off-Plan Resales Surge 56% In Q2 As Buyers Target Projects Nearing Handover
Abu Dhabi Off-Plan Resales Surge 56% In Q2 As Buyers Target Projects Nearing Handover

Abu Dhabi-based estate agents, Crompton Partners, reports 883 off-plan secondary transactions, while prices continue to rise strongly across many of Abu Dhabi’s established residential communities

August 18, 2026 UAE Business
Zoya Developments Sells out AED 104 million Dubai South project in 15 days
Zoya Developments Sells out AED 104 million Dubai South project in 15 days

Elinor by Zoya attracted strong demand from local and international buyers, with First Prime Properties acting as the project's exclusive sales partner

August 12, 2026 UAE Real Estate
Daikin Unveils Upgraded Experience Center in Dubai to Drive Sustainable Cooling and Infrastructure Innovation
Daikin Unveils Upgraded Experience Center in Dubai to Drive Sustainable Cooling and Infrastructure Innovation

Serving as a collaborative hub for consultants, contractors, distributors, dealers, and industry partners across the Middle East and Africa, the center demonstrates how advanced cooling and climate solutions are shaping the future of connected, resilient infrastructure

August 12, 2026 UAE Business
Middle East Construction & Engineering Firms Lead Global AI Productivity Gains Amid Massive Delivery Pressures: Autodesk Research
Middle East Construction & Engineering Firms Lead Global AI Productivity Gains Amid Massive Delivery Pressures: Autodesk Research

92% of Middle East organisations report productivity gains from AI, compared to 84% globally

August 12, 2026 UAE PropTech
Dubai Office Sales Climb 200% Year-On-Year To AED15.8 Billion In H1 2026
Dubai Office Sales Climb 200% Year-On-Year To AED15.8 Billion In H1 2026

The surge in sales values was driven by a rise in high value transactions, which reached their highest levels on record in H1

August 6, 2026 UAE Business
Dar Global Appoints Gulf Asia Contracting For Trump International Hotel & Tower
Dar Global Appoints Gulf Asia Contracting For Trump International Hotel & Tower

Introduced in April 2025, Trump International Hotel & Tower, Dubai is set to become a defining addition to Dubai's skyline

August 6, 2026 UAE Real Estate
ORA Developers Appoints D-Marin as Marina Consultant for BAYN, Marina in UAE
ORA Developers Appoints D-Marin as Marina Consultant for BAYN, Marina in UAE

BAYN has achieved an Estidama 1 Pearl Rating, underscoring ORA’s commitment to sustainability and compliance with Abu Dhabi’s environmental standard

August 4, 2026 UAE Real Estate
 
Subscribe to our newsletter