Advertisement predictive podcast
Advertisement predictive podcast

ALEC FITOUT Inaugurates 7,500m² Facility in RAK: Make it in the Emirates

 

New 7,500m2 bespoke fabrication facility in Ras Al Khaimah is set to create over 200 specialist jobs and introduce advanced 3D-printing capabilities to the regional fit-out sector

 
By News Desk, November 2, 2026 UAE Business
 

ALEC FITOUT Inaugurates 7,500m² Facility in RAK: Make it in the Emirates
 

ALEC FITOUT has inaugurated its advanced manufacturing facility in Ras Al Khaimah, significantly expanding its ability to locally produce everything from custom-made furniture, doors and wall panelling to decorative elements and immersive installations for hotels, ultra-prime branded residences, museums and themed entertainment destinations.

Spanning 7,500m², the facility has created more than 200 specialist jobs across design, production, engineering and skilled craft disciplines.

Aligned with the objectives of the UAE’s “Make it in the Emirates” initiative, the investment strengthens the local industrial capability, supports a more resilient regional supply chain and provides the production capacity required to serve ALEC FITOUT’s growing pipeline of complex projects across the UAE, Saudi Arabia and wider region.

Locating the facility in Ras Al Khaimah places this advanced fabrication capability close to Wynn Al Marjan Island, one of the group’s largest contracts to date and one of the region’s most ambitious integrated resort developments. ALEC FITOUT’s delivery of major fit-out works for this benchmark-setting destination calls for exceptional scale, precision and consistency, providing a powerful example of the advanced project requirements the new facility has been established to meet.

This is supported by 24 advanced machines spanning the complete production chain, including CNC machining, precision cutting, timber profiling, veneer pressing and specialist finishing systems, alongside a dedicated metalworks section with laser cutting, bending, drilling and welding capabilities.

Among the facility’s most distinctive features is its 3D-printing capabilities. The technology enables the creation of highly customised mock-ups, exhibition elements, feature installations and specialist fit-out components with exceptional precision and speed.

“Across our pipeline, we are seeing greater emphasis on the creation of destinations that offer something genuinely distinctive. These projects demand specialist skills, sophisticated prototyping, exacting quality control and the ability to translate ambitious design concepts into finished spaces.

Bringing 3D printing, advanced joinery, metalworks and specialist finishing together under one roof gives ALEC FITOUT a unique regional capability and enables us to deliver the level of craftsmanship, precision and innovation for which the UAE continually strives,” said Laurent Farge, Managing Director of ALEC FITOUT.

ALEC FITOUT  Make it in the Emirates  Ras Al Khaimah    

MORE FROM BUILT ENVIRONMENT

From Megaprojects To Human-Centred Cities - Women Are Helping Shape The UAE’s Built Sector: Grant Thornton Report
From Megaprojects To Human-Centred Cities - Women Are Helping Shape The UAE’s Built Sector: Grant Thornton Report

While women make up 56 percent of UAE STEM graduates, they are still underrepresented in leadership roles

November 2, 2026 UAE Business
ALEC FITOUT Inaugurates 7,500m² Facility in RAK: Make it in the Emirates
ALEC FITOUT Inaugurates 7,500m² Facility in RAK: Make it in the Emirates

New 7,500m2 bespoke fabrication facility in Ras Al Khaimah is set to create over 200 specialist jobs and introduce advanced 3D-printing capabilities to the regional fit-out sector

November 2, 2026 UAE Business
 Modulaire Group Expands into the Middle East
Modulaire Group Expands into the Middle East

Company launches Algeco Middle East with new regional headquarters in Dubai

November 2, 2026 UAE Business
The Next Generation of Low-Carbon Buildings in the GCC
The Next Generation of Low-Carbon Buildings in the GCC

In the GCC, low-carbon design should begin with the question: how much of the cooling load can architecture eliminate before mechanical systems even come into play?

October 30, 2026 Saudi Arabia Sustainability
Sharjah Unveils Uruk: A New Generation of Sustainable Cities
Sharjah Unveils Uruk: A New Generation of Sustainable Cities

SPARK, AUS and SEE Holding plan a city that makes its own energy and food and uses AI and robotics to take routine work off residents’ hands.

October 30, 2026 UAE Real Estate
Aldar's Profit Rises 21% As Focus Shifts to Year-End Performance
Aldar's Profit Rises 21% As Focus Shifts to Year-End Performance

The company's rental business delivered solid growth, with adjusted EBITDA increasing 27% and occupancy remaining close to full capacity.

October 29, 2026 UAE Business
DesertBoard’s PSB® Can Support Project Teams Pursuing Up to 20 LEED v5 Points
DesertBoard’s PSB® Can Support Project Teams Pursuing Up to 20 LEED v5 Points

Independent KEO mapping documents six pathways for UAE-manufactured Palm Strand Board

October 29, 2026 UAE Sustainability
A Rockefeller on Sheikh Zayed Road
A Rockefeller on Sheikh Zayed Road

With an 87-storey tower set to become Dubai's tallest commercial building, LMD is betting that the office of the future looks a lot like a hotel, and that a sixth-generation Rockefeller, is the right name to put on the door.

October 29, 2026 UAE Real Estate
As FM Portfolios Grow, Why Central Technical Teams Matter More Than Ever
As FM Portfolios Grow, Why Central Technical Teams Matter More Than Ever

Sreenivas Chivukula, Senior Manager – Technical Department at iFM Facilities Management, draws on years of experience in FM operations and technical governance to explore the principles that drive consistency, reliability, and sustainable growth across large and complex facility portfolios.

October 26, 2026 UAE
From Dormancy to Excellence: Concordia and KAIZEN Pioneer Integrated Approach to Operational Readiness at Marina 101
From Dormancy to Excellence: Concordia and KAIZEN Pioneer Integrated Approach to Operational Readiness at Marina 101

Strategic partnership demonstrates integrated expertise required to operationalize complex, never-occupied ultra-high-rise assets in Dubai

October 20, 2026
 
Subscribe to our newsletter
 
 
// Show popup after 1 second // Close button // Close when clicking outside the popup