Advertisement predictive podcast
Advertisement predictive podcast

Facility Focus

 

Burj Khalifa pioneers Intelligent Asset Management Systems

 
January 1, 1970 IFM
 

Facility Focus
 

Burj Khalifa pioneers Intelligent Asset Management Systems

Described as both a ‘Vertical City’ and ‘A Living Wonder,’ Burj Khalifa, developed by Dubaibased Emaar Properties PJSC, is a global icon. The tower is home to the world’s first Armani Hotel, 900 residential apartments, and 37 corporate suites. To meet the demands of this mega high rise, it is essential to achieve the greatest efficiency across all systems, making them reliable and fit to meet the requirements of all its occupants.

Burj Khalifa pushes the frontiers of engineering, mechanical and design expertise. To increase the reliability of the assets, the first step was to measure their criticality, operating profile and failure history. The previously used Computerized Maintenance Management System (CMMS) provided the required historical data to study failures, downtime and asset maintainability. In light of their criticality level, the associated maintenance tasks were reviewed and assessed using Reliability Centered Maintenance (RCM) techniques. The study revealed the causes of failure and what can be done to mitigate the root cause associated with each scenario. RCM studies were completed for all critical assets in Burj Khalifa and the maintenance tasks and their frequency were updated and optimised accordingly.

Adopting predictive maintenance regimes helped in increasing assets’ reliability. Knowing when the asset is about to fail, provides the maintenance staff with adequate time for planning any required downtime and fixing a potential challenge before the asset breaks down. As most of the tower’s assets are connected to the Building Automation System (BAS), we studied the possible alarms that can be generated from the systems and assigned a priority level to each alarm. This allowed the operators to prioritise alarms and escalate the same to Service Providers to formulate an action before the failure occurs.

While ensuring the assets remained reliable and robust, a great deal of attention was focused on optimising the use of energy. Burj Khalifa’s energy consumption is monitored on a daily basis to ensure the most efficient use of resources. The definition of the Internet of Things (IoT) may be very similar to the BAS with the exception of the analytical module. Burj Khalifa devised a mechanism to introduce an analytical ability to BAS and increase its intelligence level. The initial scenario was:

  • BAS generates an alarm and the same is displayed on the operator's screen
  • The operator calls the help desk and registers a Service Request (SR)
  • Helpdesk assigns the same to the relevant supervisor
  • The supervisor assigns to the available technician
  • The technician goes to site to diagnose the problem
  • He approaches the store to acquire the required tools and spares
  • Rectification is completed
  • Technician checks with BMS if alarm is at rest
  • Once complete, he provides feedback to helpdesk to help close the Work order (WO)

Note: The above procedure excludes a planned downtime for rectification.

The intelligent introduction of self-analysis that allowed an asset to diagnose itself reduced the maintenance cycle as follows:

  • The asset senses a fault analyzes the root cause and issues a WO directly to the technicians. The WO contains the required tools and spares required to rectify the fault. It will advise the technician and the relevant personnel on the planned downtime based on the operational requirements and the urgency of the fault.
  • Technician proceeds to rectify the fault on the preplanned slot.

The introduction of smart analytics has increased the productivity of the technicians and reduced downtimes. Overall, it has enhanced asset reliability, optimised maintenance tasks and frequencies while ensuring efficient use of energy and economic savings.

(The Author, Bashar Mohammad Kassab is the Director, HFM, Burj Khalifa & The Dubai Mall)

 

 

MORE FROM BUILT ENVIRONMENT

Museum of the Future to Temporarily Close on September 1 for Major Overhaul
Museum of the Future to Temporarily Close on September 1 for Major Overhaul

The overhaul is expected to be completed before February 22 2027, the fifth anniversary of the opening of the Museum of the Future

August 31, 2026 UAE Business
Dubai’s Tribe Tokenisation Partners with TheBlock to Bring Real Estate Tokenisation to Traditional Brokers
Dubai’s Tribe Tokenisation Partners with TheBlock to Bring Real Estate Tokenisation to Traditional Brokers

The Tribe-TheBlock partnership is expected to go live in September, with the two companies targeting brokers across Dubai's traditional real estate sector as the first phase of onboarding

August 27, 2026 UAE PropTech
EYWA-Way of Water to be EMFIS® Certified for Low-Electromagnetic Environment in Dubai’s Business Bay
EYWA-Way of Water to be EMFIS® Certified for Low-Electromagnetic Environment in Dubai’s Business Bay

Indoor electromagnetic exposure—generated by continuous internal wiring, Wi-Fi networks, smart systems, and external 5G infrastructure—remains largely unaddressed by standard healthy-building frameworks

August 27, 2026 UAE Real Estate
Dubai's Toyota Building Demolition: What You Need to Know
Dubai's Toyota Building Demolition: What You Need to Know

The Toyota Building's demolition is part of a broader urban renewal cycle along Dubai's oldest corridors

August 24, 2026 UAE Property Management
R.Evolution Scales EYWA Into A Global Longevity-led Real Estate Brand
R.Evolution Scales EYWA Into A Global Longevity-led Real Estate Brand

As EYWA continues to expand, R.Evolution is developing strategic collaborations with leading players across the wellness and longevity ecosystem

August 18, 2026 UAE Real Estate
Why Delaying Fire Safety Remediation Costs More Than You Think
Why Delaying Fire Safety Remediation Costs More Than You Think

Most capital planning conversations for a building's Quality and Safety Certificate naturally gravitate toward the big, visible line items, such as structural remediation, cladding replacement, or MEP overhauls

August 18, 2026 UAE Business
Abu Dhabi Off-Plan Resales Surge 56% In Q2 As Buyers Target Projects Nearing Handover
Abu Dhabi Off-Plan Resales Surge 56% In Q2 As Buyers Target Projects Nearing Handover

Abu Dhabi-based estate agents, Crompton Partners, reports 883 off-plan secondary transactions, while prices continue to rise strongly across many of Abu Dhabi’s established residential communities

August 18, 2026 UAE Business
Zoya Developments Sells out AED 104 million Dubai South project in 15 days
Zoya Developments Sells out AED 104 million Dubai South project in 15 days

Elinor by Zoya attracted strong demand from local and international buyers, with First Prime Properties acting as the project's exclusive sales partner

August 12, 2026 UAE Real Estate
Daikin Unveils Upgraded Experience Center in Dubai to Drive Sustainable Cooling and Infrastructure Innovation
Daikin Unveils Upgraded Experience Center in Dubai to Drive Sustainable Cooling and Infrastructure Innovation

Serving as a collaborative hub for consultants, contractors, distributors, dealers, and industry partners across the Middle East and Africa, the center demonstrates how advanced cooling and climate solutions are shaping the future of connected, resilient infrastructure

August 12, 2026 UAE Business
Middle East Construction & Engineering Firms Lead Global AI Productivity Gains Amid Massive Delivery Pressures: Autodesk Research
Middle East Construction & Engineering Firms Lead Global AI Productivity Gains Amid Massive Delivery Pressures: Autodesk Research

92% of Middle East organisations report productivity gains from AI, compared to 84% globally

August 12, 2026 UAE PropTech
 
Subscribe to our newsletter